CConcrete Project Tracker
Case Study · Construction Operations

From paper notebooks to a connected operations platform

Concrete Project Tracker replaced whiteboards, phone calls and scattered spreadsheets with one system that tracks every slab, flatwork, sub payment and invoice — from first request to paid PO.

16+
Modules
6
Automations
10+ hrs
Saved weekly
100%
Work billed
concrete-tracker.app / Slabs
CConcrete Project TrackerSlabsFlatworksScheduleDetailsExtrasProject NotebookSub InvoicesBack ChargesInvoicesContactsAnalytics
Slabs12 projects
+ New Project
ADDRESSSUBDIVISIONSET DATEENGINEERCITYYARDSSTATUS
1833 MEADOWLARKCreekview Meadows07/10PassedPassed28Pouring Today
5241 WILLOW BENDRainwater07/11PassedPassed32Scheduled Pour
2905 SAGEBRUSHWalsh07/12PassedPassed36City Inspection
6130 CANYON VIEWEliana07/13PassedPassed40Pending City Inspection
3417 RIVER OAKSOak Ridge07/14PassedPassed44Makeup in Progress

The Core Idea

Work flows into money — automatically

The biggest cost in a construction office isn't labor — it's leakage: completed work that never gets billed, damage that never gets charged back, and hours lost re-typing jobs into three spreadsheets.

ScheduleField completionNote bookSub paymentBuilder invoiceProfit report

Inside the App

Built like the tools the crew already knows

Familiar spreadsheet-style grids — but connected, multi-user, and impossible to lose.

concrete-tracker.app / Slabs
ADDRESSSUBDIVISIONSET DATEENGINEERCITYYARDSSTATUS
1833 MEADOWLARKCreekview Meadows07/10PassedPassed28Pouring Today
5241 WILLOW BENDRainwater07/11PassedPassed32Scheduled Pour
2905 SAGEBRUSHWalsh07/12PassedPassed36City Inspection
6130 CANYON VIEWEliana07/13PassedPassed40Pending City Inspection
3417 RIVER OAKSOak Ridge07/14PassedPassed44Makeup in Progress

The project pipeline

Every slab moves through inspections, cables and concrete orders in one grid. Color-coded statuses show at a glance what pours today, what's scheduled, and what's waiting on the city.

Billing that builds itself

Completed work appears here automatically — pre-filled with square footage, beams and price-sheet pricing. One checkbox moves it from Pending to Invoiced to PO Completed.

concrete-tracker.app / Invoices
Slabs (85)Flatwork (73)Extras (109)Pending (19)
ADDRESSCOMPANYSUBDIVISIONPOURSFTINV #INV
1833 MEADOWLARKBLUEBONNET HOMESCREEKVIEW MEADOWS08/143,541SE4158
2741 TETONCEDAR RIDGE BUILDERSOAK RIDGE08/152,970SE4160
2216 WISPYNORTHSTAR HOMESRAINWATER08/102,683SE4151
405 BIG SKYPRAIRIE OAK HOMESCANYON FALLS08/104,365SE4153
917 BLUESTEMSUMMIT CREST HOMESLIGHT FARMS08/093,120
concrete-tracker.app / Note book
405 BIG SKY
CHESMAR HOMES · 4,365 SFT · 10X28 beams
Note book
Set FormsMARTINEZ CREW07/08Approved
TrenchROCK SOLID07/09Approved
GradeLOPEZ BROS07/10Approved
CementeroEQUIPO 407/14Pending

The notebook, digitized

Each project's note book tracks every trade — who did the work, when, for how much, and whether it's been approved and paid. No more deciphering handwriting.

One morning view for the whole crew

The Daily Schedule assembles itself every day from every module — pours with yardage and concrete times, flatwork preps with crews, city and engineer inspections, and detail jobs.

  • Pours show provider, order number, mix and pour time
  • Sticky schedule notes for day-specific instructions
  • Replaces the 6 AM round of phone calls entirely
concrete-tracker.app / Daily Schedule
Tuesday, July 215 items today
POUR14497 LOVELACEStonehollow · 25 yds · 8:00 AM
POUR2617 RADIANTNormandy · 32 yds · 9:30 AM
PREP1120 BLUESTEMFlatwork · Grupo 3
INSPECTION8716 CARNATIONCity inspection · Eliana
DETAIL405 BIG SKYPatch garage drop · $350
concrete-tracker.app / Analytics
Cost vs Price — July
PriceCost
$190.6k
Invoiced
$131.4k
Costs
31%
Avg margin
SOUTHGATE
$41.2k
DREES
$33.5k
NORMANDY
$52.8k
CHESMAR
$25.1k
WINDSOR
$38.0k

Margin per job, not per year

Analytics compares every invoice against its real costs — concrete by supplier and PSI, subcontractor labor from the notebooks, pump trucks and manual entries — per builder and per address.

  • Cost vs price breakdowns saved on each invoice
  • Reports as tables, bar or pie charts — exportable to Excel & PDF
  • Scheduled reports with frozen snapshots for consistent numbers

Mobile Ready

Built for the field, not just the office

Field supervisors couldn't update from the job site — so data got typed in at 6pm from memory. Now it gets updated at the pour.

Dedicated mobile views

Card-style lists and detail screens with bottom navigation — built for thumbs, not spreadsheets.

Photos & plans on site

Snap up to five job-site photos and open PDF plans right from the slab or flatwork record.

Pull to refresh

The latest pours, inspections and crew assignments are one swipe away.

Real-time with the office

Every update from the field shows up on office screens within seconds.

9:41
Slabs
Active · 24Poured · 312
1424 Wildflower Ln
HIGHLAND HOMES
Pour Today42 yd · 3500 · 7:00 AM
902 Cedar Creek Dr
PERRY HOMES
City PassedPour 09/04
77 Summit Ridge
SHADDOCK
City ScheduledInsp. 09/03 AM
310 Prairie View
PERRY HOMES
Eng PassedCity pending
55 Oak Hollow
CUSTOM
SetCables ordered
Slabs
Flatwork
Schedule
Details
Invoices

Capabilities

Every part of the business, covered

Each module, the problem it replaced, and the result.

Slabs pipeline with color-coded statuses

Slabs & Flatworks

BeforeFoundation and flatwork jobs tracked on paper and whiteboards — missed inspections, forgotten pour dates, no history.

NowLive pipelines from request to pour: set dates, cables, plumbing, engineer & city inspections, concrete orders, crews and curb cuts — all inline-editable with attachments and plan reviews.

One source of truth for the whole crew. Nothing falls through the cracks.

Tue, Sep 24 items today
Pour1424 Wildflower Ln42 yd · 3500 · 7:00 AM
Prep902 Cedar Creek DrGrupo 3 · Curb cut
City Insp.77 Summit RidgeScheduled · AM
Detail310 Prairie ViewJob #4471 · Patch

Daily Schedule

BeforeEvery morning someone compiled 'what's happening today' by phone and text.

NowAn auto-built daily view of pours, preps, inspections and detail work pulled from every module.

The day's plan is ready before anyone picks up a phone.

Details · 12Extras · 8
Job #AddressDescriptionAmountPODone
4471310 Prairie ViewPatch garage step$350PO-2231
44721424 WildflowerExtra 6" beam$1,200PO-2240
447355 Oak HollowWarranty crack fill$180
4474902 Cedar CreekAdd sidewalk section$860PO-2244

Details & Extras

BeforeSmall extra jobs and warranty details got done but never billed — pure lost revenue.

NowEvery detail and extra logged with job #, description, amount and PO. Completing one automatically creates an invoice record.

If it got done, it gets billed.

1424 Wildflower LnHIGHLAND HOMES · 2,860 sft
Set Forms
J. Ramirez
08/12
✓ Paid
Trench
Los Primos
08/13
✓ Paid
Grade
M. Torres
08/14
Pending
Back Out
J. Ramirez
08/18
Pending
Cementero
Crew 2
08/20
Pending

Note book

BeforeSubcontractor work lived in paper notebooks only one person could read.

NowA digital note book per project: forms, trench, grade, backout and cementero tracked with sub, date, adjustments, approvals and check dates.

Sub payments are transparent, auditable and never depend on one notebook.

Subcontractor invoices rollup

Sub Invoices & Back Charges

BeforePaying subs meant reconciling notebooks against memory; crew damage was never recovered.

NowWork rolls up per sub with grouped invoices, approval flags and check dates. Back charges auto-link to payment deductions.

Sub payroll prep drops from hours to minutes — and damage costs get recovered.

Invoices module with pricing detail panel

Invoices

BeforeBuilder billing required manually cross-referencing pours, price sheets and square footage.

NowInvoices auto-created from completed work, enriched with SFT and beams, priced against company price sheets, tracked Pending → Invoiced → PO Completed.

Billing follows the work automatically, including profit breakdowns per job.

HIGHLAND HOMESPrice SheetSuppliersUpdated 08/01
SectionItemBeamsPriceUnit
FoundationPost-tension slab12"$4.85/ sft
FoundationPost-tension slab14"$5.10/ sft
FlatworkDriveway 4"$6.25/ sft
Pump TruckBoom pump$850each

Contacts, Price Sheets & Suppliers

BeforeBuilder pricing and supplier spend scattered across emails and spreadsheets.

NowBuilders, subdivisions and per-company price sheets in one place — plus concrete utilization, PSI pricing and rock trench tracking per provider.

Every quote uses the current agreed price; concrete spend is visible per pour.

Cost vs Price · by builderAug 2026
HIGHLAND
PERRY
SHADDOCK
DAVID WKLY
CUSTOM
Revenue
$412,300
Cost
$288,900
Margin
29.9%

Analytics & Reports

BeforeProfitability per job was a guess.

NowCost vs price analysis, status reports and subcontractor summaries — tables or charts, exportable, schedulable, with frozen snapshots.

Management sees margin per job instead of guessing at year end.

1424 wild1 of 1
AddressBuilderStatusPour
902 Cedar Creek DrPERRYEng Passed09/04
77 Summit RidgeSHADDOCKCity Sched.09/05
1424 Wildflower LnHIGHLANDPoured09/02
310 Prairie ViewPERRYSet09/09

Global Address Search

BeforeFinding one address meant clicking through six modules.

NowA Ctrl+F style search from the top bar that jumps to any address in any grid and highlights the row.

Any project found in seconds from anywhere.

Role permissions
SlabsScheduleNote bookInvoicesAnalyticsAdminSchedulerField Sup.AR
Audit trail
Maria G. updated pour_date
1424 Wildflower · 2m ago
Luis P. created
310 Prairie View · 2m ago
Ana R. marked invoiced
77 Summit Ridge · 2m ago

Users, Roles & Audit

BeforeEveryone saw everything — including financials — and changes were untraceable.

NowRole-based page permissions, invites, live activity tracking, and a full audit trail of every create, update and delete.

Field crews see schedules; only the office sees money. Every change is traceable.

Backup history Live sync on
DateTriggerFilesRecordsStatus
09/02 1:00 PMScheduled13 CSV18,420Completed
09/02 12:00 PMScheduled13 CSV18,417Completed
09/02 11:00 AMScheduled13 CSV18,402Completed
08/30 2:00 AMWeekly13 CSV18,210Completed

Backups & Reliability

BeforeThe business depended on one computer and one spreadsheet.

NowScheduled full-data CSV backups with history, plus real-time sync pushing every change to every open screen.

Disaster-proof, always-consistent data across office and field.

9:41
Slabs
1424 Wildflower Ln
HIGHLAND HOMES · Pour 09/02
Project Plans
Foundation Plan – Rev C.pdfPDF
Engineer Letter.pdfPDF
Job Site Photos
4 / 5
Slabs
Flatwork
Schedule
Details
Invoices
Foundation Plan – Rev C.pdf· 1424 Wildflower Ln
100%
1
2
3
Post-tension foundation plan
Job Site Photos
5 / 5

Project Plans & Photos

BeforePlans lived in email threads and job-site photos stayed on someone's phone.

NowEvery slab and flatwork record holds its PDF plans (with built-in compression and plan-review notes) plus up to five job-site photos captured right from the phone.

Proof of work and the latest plan revision are always one tap from the address.

Automation

Working in the background, 24/7

These run without anyone touching a button.

Slab → Invoice Sync

~15 min / pour

A slab is marked poured → the invoice record is created and enriched with SFT, beams and notes from the matching note book automatically.

Flatwork / Extra / Detail → Invoice

~10 min / job

Any job is marked completed → an invoice is auto-created with builder, amounts and PO data — and auto-removed if the source changes. Duplicates are cleaned up.

Full Audit Trail

Dispute-proof

Any record changes anywhere → an audit entry captures who changed what, old vs new values, and a full snapshot.

Scheduled Data Backups

Zero-effort safety

On a schedule → every entity is exported to CSV and stored with record counts — full recovery history. (Paused in this demo.)

Scheduled Reports

~2 hrs / week

Daily, weekly or monthly → reports regenerate as frozen snapshots so management gets consistent numbers automatically.

Real-Time Multi-User Sync

No stale data

Anyone edits anything → live subscriptions push changes to every open screen within seconds.

concrete-tracker.app / Invoices — auto-created from completed work
CConcrete Project TrackerSlabsFlatworksScheduleDetailsExtrasProject NotebookSub InvoicesBack ChargesInvoicesContactsAnalytics
Invoices19 pending
Slabs (85)Flatwork (73)Extras (109)Pending (19)
ADDRESSCOMPANYSUBDIVISIONPOURSFTINV #INV
1833 MEADOWLARKBLUEBONNET HOMESCREEKVIEW MEADOWS08/143,541SE4158
2741 TETONCEDAR RIDGE BUILDERSOAK RIDGE08/152,970SE4160
2216 WISPYNORTHSTAR HOMESRAINWATER08/102,683SE4151
405 BIG SKYPRAIRIE OAK HOMESCANYON FALLS08/104,365SE4153
917 BLUESTEMSUMMIT CREST HOMESLIGHT FARMS08/093,120

Slab → Invoice Sync in action: every poured slab appears here automatically, already enriched with SFT, beams, notes and price-sheet totals — no re-typing.

concrete-tracker.app / Sub Invoices — rolled up from notebooks
CConcrete Project TrackerSlabsFlatworksScheduleDetailsExtrasProject NotebookSub InvoicesBack ChargesInvoicesContactsAnalytics
Subcontractors Invoice4 items
+ Manual Entry
Pending (26)Paid (44)
ADDRESSCOMPANYSECTIONSUBCONTRACTORDATESFTRATEAMOUNT
1833 MEADOWLARKBLUEBONNET HOMESFormsGrupo Aguilar08/312,400$0.65$1,560.00
5241 WILLOW BENDCEDAR RIDGECementeroCementeros Del Norte09/013,100$0.55$1,705.00
2905 SAGEBRUSHNORTHSTAR HOMESTrenchGomez Crew09/021,850$0.40$740.00
6130 CANYON VIEWPRAIRIE OAKBack ChargedJavier Mendoza09/03-$150.00
Total (4 items)$3,855.00

Sub payments, assembled automatically: work logged in the notebooks rolls up per subcontractor with rates, amounts, adjustments and back-charge deductions — payroll prep in minutes.

The Bottom Line

What changed for the business

Revenue protection

Every completed slab, flatwork, extra and detail automatically becomes an invoice — nothing gets done for free anymore.

Faster billing cycles

Invoices are pre-filled with pricing, SFT and beams, so billing happens days sooner.

Sub payment clarity

Approvals, check dates and back-charge deductions in one place — no more notebook disputes.

Accountability

A full audit trail and role-based access mean every change is traceable and financials stay private.

Resilience

Scheduled backups and real-time sync mean the business no longer depends on any single computer or notebook.

Field-to-office speed

Mobile updates from the pour site mean the office sees reality, not yesterday's version of it.